PUBLIC NOTICE – 350
Alabama Department of Environmental Management
P O Box 301463 (Zip 36130-1463)
1400 Coliseum Boulevard (Zip 36110-2059)
Montgomery, Alabama
On May 22, 2007, Hyundai Motor Manufacturing Alabama, LLC (Facility
No. 209-0090) submitted a complete
Prevention of Significant Deterioration (PSD) Permit application for increase in previously established BACT limits.
This facility is located at
The proposed modification is subject to the requirements of
the Prevention of Significant Deterioration (PSD) regulations as set forth in
ADEM Admin. Code r. 335-3-14-.04. An
ADEM-Air Division technical staff preliminary determination indicates:
1.
Best
Available Control Technology (BACT) is represented for control of nitrogen oxides (NOx) and volatile organic compounds
(VOC). In determining BACT, the
Department considered the impact of the control technology on air pollutants
that may be emitted by the source including those not regulated by the Clean
Air Act. A discussion of how BACT was
determined is included in the Department’s preliminary determination.
2.
The
maximum combined pollutant concentration from Hyundai
Motor Manufacturing Alabama, LLC would be less than the National Ambient
Air Quality Standards (NAAQS). The NAAQS
are levels set by the Environmental Protection Agency which identify the
ambient concentration necessary to protect human health and welfare with an
adequate margin of safety.
3.
The
largest maximum ambient concentration of non-criteria air pollutants was
determined to be 96.46% of the ADEM's
guideline of 1/40 of the threshold limit
value for those compounds as adopted by the American Conference of Governmental
Industrial Hygienists.
ADEM has determined that the limitations proposed by the
company would properly limit emissions.
Copies of the preliminary determination are available for
public inspection electronically via http://adem.alabama.gov/PublicNotice/PublicNotice.htm. Copies of the complete project file are
available for public inspection at the ADEM Main
Office located at 1400 Coliseum Blvd,
Montgomery, Alabama, Monday through
Friday (except legal holidays), 8:00 a.m. to 5:00 p.m., and at the following
address:
Russell A. Kelly, Chief
Permits and Services Division
ADEM
1400 Coliseum Blvd.
[Mailing address: PO Box 301463; Zip 36130-1463]
Montgomery, Alabama 36109-2608
(334) 271-7714
A nominal fee for copying and/or mailing may be
charged. Arrangements for copying should
be made in advance.
Persons
wishing to comment may do so, in writing, to the Department’s named contact
above within 30 days following the publication date of this notice. In order to affect final decisions, comments
must offer technically substantial information that is applicable to the
proposed application. All comments must
be received no later than 5:00 p.m., March 3, 2008.
A written
request for a public hearing may also be filed within that 30-day period and
must state the nature of the issues proposed to be raised in the hearing. The Director shall hold a public hearing
whenever it is found, on the basis of hearing requests, that there exists a
significant degree of public interest in the permit application.
The final
determination of the ADEM concerning the application will be available for
inspection at the ADEM Main Office within
five (5) working days of a final decision being made. In addition, notice will be sent to any
person who requests notice of the final determination in writing (address:
Russell A. Kelly, ADEM Permits & Services Division, P. O. Box 301463,
Montgomery, Alabama 36130-1463).
The
Department maintains a list of interested individuals who are mailed legal
notices regarding proposed permits. If
you wish to receive such notices, contact the Permits & Services Division
via telephone (334-271-7714), e-mail (www.permitsmail@adem.state.al.us),
or postal service (P.O. Box 301463, Montgomery, Alabama 36130-1463).
This
notice is hereby given this February 1, 2008, by authorization of the
Alabama Department of Environmental Management.
_______________________
Onis
“Trey” Glenn, III
Director