Land Division
Waste
Pre-Approval and Determinations
A
generator of hazardous waste or other special wastes desiring to dispose of
these wastes in permitted disposal facilities in Alabama must receive approval
from ADEM prior to such disposal, in accordance with 335-14-2-.01 and
335-13-4-.26.
Hazardous Waste
Pre-Approval
Generators of hazardous waste must complete a hazardous waste determination
prior to transporting the wastes to a permitted hazardous waste disposal
facility in Alabama. The generator may use
ADEM Form 278 or a form
provided by the disposal facility to complete and forward to ADEM for review and
approval. If the hazardous waste may be disposed of in a permitted disposal
facility, ADEM will provide written notice to the generator or disposal
facility.
Hazardous Waste
Determination Fact Sheet
Solid and
Special Waste Pre-Approval
Special
waste defined in 335-13-1 may be disposed of in certain solid waste landfills if
approved by ADEM. Generators must completed
ADEM Form 300 and forward it
to ADEM for review and approval. If the waste is appropriate for disposal in
the landfills proposed for use, ADEM will provide the generator with an approval
letter. It is the responsibility of the generator to provide the landfill
receiving the special waste with a copy of the ADEM approval letter. Waste
approvals for certain waste streams may be valid for a period of two years.
Waste Disposal Approvals
Fact Sheet
Top of Page |
Land Main Page
Contact Information
ADEM
Attn: Environmental Services Branch
Post Office Box 301463
Montgomery, Alabama 36130-1463
Telephone Number : (334) 271-7984
Fax Number: (334) 279-3050
You are visitor No.
Since August 18, 2004
|